SOHAR signs six industrial investment agreements

SOHAR signs six industrial investment agreements

SOHAR Freezone has signed six new industrial land lease agreements. The projects represent more than $163m of planned investment, combining manufacturing facilities, specialised storage, and international distribution operations across approximately 440,000 sq m in Oman.


IN Brief:

  • SOHAR Freezone has secured six agreements representing more than $163m in proposed industrial and logistics investment.
  • The projects include a 317,000 sq m automotive manufacturing park, a transformer factory, medical device facilities, and textile sorting.
  • Two dedicated warehouse developments will support electrical goods distribution and equipment re-exports between Asia, Oman, and African markets.

SOHAR Freezone has signed six land-lease agreements representing more than $163m in planned investment across approximately 440,000 sq m of industrial and logistics space in Oman. The projects combine manufacturing facilities with specialised warehousing and distribution operations, expanding the range of goods that could be produced, stored, and exported through the port-linked industrial zone.

The agreements were signed on 8 November at an investment event organised by the Public Authority for Special Economic Zones and Free Zones (OPAZ). The projects cover automotive manufacturing, power and distribution transformers, medical devices, used-clothing sorting, and storage facilities for electrical products and engineering equipment. SOHAR has identified the investments and proposed site areas, but has not published a common timetable for construction or occupation.

The largest agreement involves Sohar Automotive & Advanced Industries Park SPC (FZC), established by investment company EW Partners. Approximately $100m will be invested in real assets across a site covering around 317,000 sq m. The first phase is intended to deliver approximately 180,000 sq m of manufacturing plants, workshops, and warehouses, providing accommodation for automotive suppliers and other advanced manufacturing businesses.

The first phase combines different industrial property functions rather than concentrating exclusively on storage. Manufacturing plants require space for production equipment and material processing, while workshops and warehouses can support components, maintenance, finished goods, and dispatch. The final configuration will depend on the companies occupying the development and their operational requirements. SOHAR has not identified the full tenant roster or confirmed the internal equipment planned for individual buildings.

The size of the automotive development also distinguishes it from the other agreements. Its 317,000 sq m site accounts for most of the land covered by the six projects, while the proposed 180,000 sq m first phase is a building programme within that larger development. Those figures should not be added together when calculating the amount of land allocated to the agreement.

Voltamp International LLC (FZC) will invest approximately $39m in a 75,000 sq m facility producing power and distribution transformers. The planned factory will use copper, electrical steel, mild steel, and industrial oils, supporting the production of electrical equipment for regional and international markets. Its supply chain requirements will differ from those of a conventional distribution centre because incoming materials must be coordinated with manufacturing processes before finished equipment can be dispatched.

Transformer manufacturing depends on the controlled supply of electrical conductors, magnetic materials, structural components, and insulating media. Different materials require suitable storage and handling arrangements, particularly where large or heavy components are involved. The proposed factory therefore creates requirements for industrial material movements as well as finished-product logistics, although the company has not disclosed its intended annual production capacity or equipment layout.

Lalan Middle East LLC has committed approximately $12m to a 7,500 sq m expansion of medical device manufacturing and integrated services. The project includes downstream manufacturing, laboratory facilities, and specialised warehousing. SOHAR expects the development to support healthcare supply chains within Oman and the wider Gulf Cooperation Council region, while creating additional technical and production capabilities.

Medical device supply chains can require documented material control, product traceability, and storage conditions appropriate to the products being handled. Those requirements differ according to the device, its components, and the applicable regulatory approvals. The agreement does not specify which product classes will be manufactured, so particular cleanroom classifications, temperature ranges, and compliance certifications cannot yet be attributed to the proposed facility.

A fourth industrial agreement covers textile reuse. Five Star Group (FZC) LLC will invest approximately $10m in a 25,000 sq m used-clothing sorting operation. The business intends to process textiles for onward distribution to African markets, including Angola, Congo, and Tanzania, generating additional cargo movements through SOHAR Port as materials are received, classified, and prepared for export.

Unlike the manufacturing projects, the textile facility will focus on processing goods already in circulation. Its operations will involve receiving consignments, separating materials into relevant categories, and preparing sorted products for subsequent transport. SOHAR has not published an annual throughput target, a detailed grading system, or the machinery to be used, leaving the eventual processing capacity unquantified.

The remaining two agreements concentrate directly on storage and distribution. Volt Power and Lighting (FZC) LLC will invest approximately $2.08m in an 8,406 sq m warehouse for importing, storing, trading, and re-exporting finished electrical and lighting products. The planned operation will link Asian suppliers with African markets, using SOHAR as a location for holding and distributing goods manufactured elsewhere.

Dynamic Logistics Services will invest approximately $390,000 in a separate 7,000 sq m storage and re-export facility. Its initial activities will concentrate on tools and engineering equipment, with potential expansion into more specialised warehousing. The proposed site is smaller than the manufacturing investments, but its function is directly linked to the movement and distribution of industrial goods through the free zone.

These two developments illustrate the distinction between an industrial facility producing goods locally and a logistics operation managing imported inventory. Manufacturing requires raw materials and components to be supplied in accordance with production schedules, whereas distribution facilities are organised around stock receipt, storage, order preparation, and dispatch. Both depend on reliable transport connections, but they create different patterns of warehouse use and freight movements.

SOHAR Port and Freezone combines industrial property with maritime infrastructure on Oman’s northern coast. Its integrated location allows manufacturers and logistics operators to establish facilities near the port services used for international trade. The proximity can support the movement of incoming materials and exported products, although individual businesses will still need suitable customs arrangements, inland transport, and commercial agreements with their logistics providers.

The six investments cover different stages of industrial supply chains, from the receipt of manufacturing inputs to the storage and re-export of finished products. Their reported values represent planned capital commitments rather than completed expenditure or existing operating revenue. Similarly, the announced areas describe proposed development sites, not newly commissioned warehouse capacity available for immediate occupation.

The next operational steps will be the development of the individual sites, confirmation of construction schedules, and establishment of the facilities required by their occupiers. SOHAR has not yet provided combined employment, cargo throughput, or completion figures for the programme. Those measures will become relevant as the agreements progress from land commitments to operating industrial and logistics facilities.


Stories for you


  • California port watchmen extend talks to 20 November

    California port watchmen extend talks to 20 November

    Port employers have extended watchmen negotiations at California container terminals. Their agreement with ILWU Local 26 now runs through 20 November, postponing the immediate prospect of industrial action at Los Angeles and Long Beach.


  • Nevilles secures Erith distribution centre

    Nevilles secures Erith distribution centre

    Nevilles has secured a new distribution headquarters in southeast London. The tabletop products business has signed a 15-year lease on Erith Logistics Hub, with occupation of the 71,530 sq ft property planned for April 2027.