IN Brief:
- Wan Hai plans to introduce its China India Service 8 loop in late November 2026, with calls across Vietnam, China, Malaysia, and western India.
- The published rotation includes Haiphong, Qinzhou, Nansha, Shekou, Port Klang, Mundra, and Nhava Sheva, with Port Klang visited in both directions.
- Vessels in the 2,800–3,000 TEU range are planned for a 35-day round trip; the exact first sailing and port-pair transit times have not been established.
Wan Hai Lines plans to introduce a direct container service linking northern Vietnam, South China, Malaysia, and western India in late November 2026. Named China India Service 8, or CI8, the loop will operate with vessels in the 2,800–3,000 twenty-foot equivalent unit (TEU) range and a published round-trip cycle of 35 days.
The sequence starts at Haiphong, then calls at Qinzhou, Nansha, Shekou, Port Klang Northport, Mundra, and Nhava Sheva before returning through Port Klang Northport to Haiphong. The two Malaysian calls place Port Klang on both legs of the rotation. Wan Hai has identified the operating geography and vessel size, while the detailed port-pair timetable and the precise first sailing remain to be confirmed.
Haiphong provides a Vietnamese gateway for manufacturing centres in the country’s north, while Qinzhou, Nansha, and Shekou connect the loop with several South China export catchments. Mundra and Nhava Sheva serve different industrial and distribution hinterlands in western India. Using the same rotation for these markets gives shippers an alternative to booking separate legs through another carrier, although the actual advantages will depend on vessel schedules and available slots.
Containers carried between two advertised CI8 calls can remain aboard the same vessel through intermediate ports, avoiding a planned ship-to-ship transfer on that particular movement. At each stop, however, the vessel must enter port, work its allocated cargo, and depart under local operating conditions. The order of these calls determines how much of the 35-day circuit a shipment uses, so a direct port pairing is not necessarily the fastest routing between the two markets.
A 35-day circuit describes the time needed for a vessel to complete the published rotation, including its port stays. It cannot be used as the transit time for an individual container: a Haiphong–Mundra shipment, for instance, follows only one part of the circuit, whereas a return movement encounters a different sequence of calls. Port-specific arrival, departure, and cut-off times will be needed before importers can make firm delivery comparisons.
With ships capable of carrying approximately 2,800–3,000 TEU, CI8 is designed around medium-sized regional container vessels rather than the much larger ships used on major east–west trades. A TEU is a standard container-capacity measure based on a 20-foot box; a 40-foot container generally accounts for two TEU. The advertised vessel class describes nominal carrying capacity, not guaranteed space on any particular departure.
Before cargo can move on CI8, Wan Hai will have to confirm a booking, position the appropriate empty container, identify the receiving terminal, and publish documentation and gate cut-offs. Export packing, customs formalities, and inland collection must then fit those deadlines. The vessel’s nominal TEU capacity alone gives neither the number of empty boxes available at a particular origin nor the space accepted for a specific sailing.
Port Klang Northport appears twice, once on the westbound leg before Mundra and once after Nhava Sheva on the return. The two calls create separate opportunities for Malaysian cargo to enter or leave the circuit. Each also entails pilotage, berth access, and container exchange, with the effect on transit times depending on the final timetable and the allocation of time in port.
At Mundra and Nhava Sheva, the sea movement connects to customs, terminal release, container haulage, and the inland distribution network serving western India. The two ports are separate gateways with different connections and onward costs. The fact that both appear in one rotation does not make them interchangeable for a consignee whose factory or warehouse is closer to one of them.
Importers purchasing components or intermediate goods in northern Vietnam and South China may use the Indian calls to plan replenishment into their western India facilities. Required buffer stock will depend on how consistently cargo arrives, as well as the inland time from Mundra or Nhava Sheva. Until the first sailings establish a performance record, the service provides another announced routing choice rather than a measurable reduction in inventory holdings.
The carrier has specified vessels in the 2,800–3,000 TEU class and a 35-day circuit, but these figures do not establish the number of ships allocated or the departure frequency. A five-week cycle could be operated with different fleet sizes and sailing intervals. Freight forwarders will need the final vessel line-up and advertised departures before calculating the weekly space offered across the route.
Wan Hai’s late-November start will bring the announced sequence into the carrier’s operational network. Confirmed sailings and booking windows will show how CI8 fits with its existing services, including whether customers can connect onwards from the listed calls. That information will also allow manufacturers and forwarders to align export despatches with the receiving terminals rather than relying on the sequence of port names alone.
Terminal congestion, missed berth windows, and inland delivery delays can still alter arrival dates once the service begins. The first completed rotations will establish a practical measure of schedule reliability and container availability for the Vietnam–South China–India trade. Those results, alongside published port-pair transit times, will determine where the new loop offers a useful operating alternative.



