CEVA opens Italian logistics hub for Daikin

CEVA opens Italian logistics hub for Daikin

CEVA opens a major Italian warehouse dedicated to Daikin logistics. The 50,000-square-metre Castel San Giovanni site expands the companies’ European relationship; throughput and staffing figures remain undisclosed.


IN Brief:

  • CEVA Logistics has opened a 50,000-square-metre facility at Castel San Giovanni, near Piacenza.
  • The site supports heating, ventilation and air conditioning manufacturer Daikin through contract logistics services.
  • The new site extends a European relationship that also includes a separately announced 27,000-square-metre Spanish warehouse project.

CEVA Logistics has opened a 50,000-square-metre contract logistics facility at Castel San Giovanni, near Piacenza in northern Italy, to support the European operations of heating, ventilation and air conditioning manufacturer Daikin. The warehouse adds distribution capacity to an established customer relationship, with CEVA describing the site as part of its expansion in a major Italian logistics corridor. The company has not disclosed an annual throughput target or a headcount for the new operation.

Castel San Giovanni is part of the logistics corridor around Piacenza, where road connections support manufacturing distribution across northern Italy. CEVA has confirmed the new location and its Daikin customer, but has not specified the site’s individual delivery territories, storage technology, or number of employees. The available building space is therefore a clearer measure of this opening than any claimed throughput improvement.

Daikin supplies heating, ventilation, and air conditioning equipment, a product range that can include bulky assembled units as well as smaller accessories and service parts. These goods require different storage locations and handling equipment according to their dimensions, packaging, and load stability. CEVA has not itemised the product range assigned to Castel San Giovanni, so a precise warehouse layout or automated handling system cannot be inferred from the customer’s wider catalogue.

Warehouse area is only one input into usable storage capacity. Pallet positions depend on rack height, aisle widths, fire-safety clearance, goods-in and dispatch space, and the shape of products moving through the building. A site handling bulky equipment can need more floor-level storage and loading space than one receiving uniform cartons. CEVA has not supplied a pallet-position count or daily dispatch capacity for its new 50,000-square-metre operation.

Contract logistics typically involves an operator providing storage, inventory administration and order fulfilment services under an agreement with a customer. The operator may manage labour, equipment and transport interfaces while the customer determines the order requirements and product assortment. CEVA has confirmed the Daikin relationship at the new facility, but it has not supplied sufficient detail to establish whether inbound transport, final delivery or particular value-added activities are included in this specific local contract.

Stock accuracy is essential when orders contain equipment in different sizes and specifications. Each inbound unit needs a reliable product identifier and recorded storage location, while picking and dispatch systems have to keep reserved stock aligned with customer orders. Such interfaces are routine requirements in contract logistics, but CEVA has not named the warehouse management platform used at the Italian site.

Bulky equipment also affects loading and transit preparation. Vehicle plans have to account for product dimensions, load restraint, and access for appropriate lifting equipment; delicate components may require protection from movement during transfer. These constraints determine handling choices independently of the building’s square metreage. No measured reduction in breakage, transport time, or handling cost has been published for the new warehouse.

The Italian opening extends a relationship that includes a separate 27,000-square-metre warehouse project in Tórtola de Henares, Spain, described by CEVA in January 2026. At that time, operations at the Spanish site were expected in the first quarter of 2027. The two facilities have separate implementation timetables, and the Italian opening does not confirm that the Spanish site is already operating.

Operating more than one regional distribution site can shorten some delivery routes, but inventory must then be allocated across buildings. Stock held in several locations may improve local availability while increasing total inventory requirements when demand forecasts are uncertain. CEVA has not quantified the change in delivery distance, stockholding, or replenishment frequency arising from Castel San Giovanni.

Under a contract logistics arrangement, the warehouse operator handles agreed storage and fulfilment activities while the customer retains responsibility for its product and order requirements. The commercial scope of the Daikin agreement at Castel San Giovanni has not been disclosed in full. Changes in system integration, service levels, and transport allocation will therefore need to be judged from subsequent operating information rather than the floor area alone.

CEVA is part of the CMA CGM Group, whose businesses include shipping and other freight services. The new Italian facility is a contract logistics development for Daikin; no exclusive transport or shipping arrangement for all of the customer’s cargo has been disclosed. The different logistics services may be connected commercially, but that does not establish which carriers will move individual shipments.

The Castel San Giovanni warehouse has opened with 50,000 square metres serving Daikin’s logistics operations. Its eventual effect on service levels will depend on the product mix, inventory allocation, and flow of orders through the site. CEVA has not released throughput or productivity figures for the operation.


Stories for you


  • CEVA opens Italian logistics hub for Daikin

    CEVA opens Italian logistics hub for Daikin

    CEVA opens a major Italian warehouse dedicated to Daikin logistics. The 50,000-square-metre Castel San Giovanni site expands the companies’ European relationship; throughput and staffing figures remain undisclosed.


  • WFS takes United Airlines Madrid cargo contract

    WFS takes United Airlines Madrid cargo contract

    WFS gains another United Airlines cargo handling contract in Spain. Its Madrid assignment covers cargo on 14 weekly Boeing 767 and 787 flights serving New York and Washington.